Key Documents - Construction
Community Updates
Document Title
Type
Size
Date
Hills M2 Upgrade Community Update January 2012
Adobe PDF
1.1 MB
06 Jan 2012
Hills M2 Upgrade Community Update October 2011
Adobe PDF
1.3 MB
18 Oct 2011
Community Update Brochure July-Sept 2011
Adobe PDF
3.9 MB
22 Jul 2011
Hills M2 Upgrade Community Update April 2011
Adobe PDF
3.7 MB
21 Apr 2011
Hills M2 Upgrade Community Update Dec 2010
Adobe PDF
1.24 MB
29 Nov 2010
M2 Upgrade Community Update May 2010 (Amended 18 June 2010)
Adobe PDF
2.18 MB
19 May 2010
Notifications - Western Zone: Watkins Road, Baulkham Hills to Pennant Hills Road, Pennant Hills
Document Title
Type
Size
Date
Darling Mills Creek Bridge concrete pour 17 February 2012
Adobe PDF
561 KB
13 Feb 2012
Cable installation west of Barclay Road 7 February 2012
Adobe PDF
356 KB
31 Jan 2012
Concrete pour Yale Close Bridge 3 February 2012
Adobe PDF
542 KB
27 Jan 2012
Pavement Strengthening Oakes Rd to Yale Close 1 February 2012
Adobe PDF
302 KB
25 Jan 2012
Pavement Strengthening Yale Close to Barclay Road night work 23 Jan 2012
Adobe PDF
315 KB
23 Jan 2012
Saw cutting Oakes Rd to Yale Close night work 23 Jan 2012
Adobe PDF
324 KB
23 Jan 2012
Removal of tolling signage Western Zone 20 Jan 2012
Adobe PDF
340 KB
20 Jan 2012
Night Work Yale Close Bridge bridge concreting 18 Jan 2012
Adobe PDF
565 KB
18 Jan 2012
Night work for service connection Windsor Road
Adobe PDF
365 KB
16 Jan 2012
Relocation of access gates west of Windsor Road
Adobe PDF
274 KB
13 Jan 2012
Night work for stitch pour at Yale Close Bridge January 2012
Adobe PDF
549 KB
10 Jan 2012
Barclay Road Bridge night work for water main relocation
Adobe PDF
344 KB
09 Jan 2012
Line marking and barrier realignment near Oaks Road night work
Adobe PDF
352 KB
04 Jan 2012
Night work to remove temporary noise walls west of Windsor Road January 2012
Adobe PDF
274 KB
05 Jan 2012
Night work to install concrete barriers on Hills M2 near Langdon Road and Cropely Drive December 2011
Adobe PDF
393 KB
27 Dec 2011
Windsor Road Bridge night work
Adobe PDF
410 KB
12 Dec 2011
Night work for watermain relocation at Barclay Road
Adobe PDF
344 KB
12 Dec 2011
Night work for saw cutting Oakes Road to Yale Close new dates
Adobe PDF
336 KB
9 Dec 2011
Show archived documents
Darling Mills Creek girder installation December 2011
Adobe PDF
283 KB
24 Nov 2011
Barclay Road Bridge traffic management night work December 2011
Adobe PDF
582 KB
24 Nov 2011
Yale Close Bridge beam installation night work November 2011
Adobe PDF
348 KB
21 Nov 2011
Night work for saw cutting Oakes Road to Yale Close November-December 2011
Adobe PDF
344 KB
21 Nov 2011
Windsor Road service relocation night work November 2011
Adobe PDF
365 KB
17 Nov 2011
Barclay Road traffic management changes 24 November
Adobe PDF
573 KB
17 Nov 2011
Cross stitching Darling Mills Creek to Barclay Road November - December 2011
Adobe PDF
311 KB
14 Nov 2011
Cross stitching Darling Mills to Barclay Road November 2011
Adobe PDF
311 KB
14 Nov 2011
Windsor Road Bridge concrete pour night work November 2011
Adobe PDF
598 KB
11 Nov 2011
Barclay Road traffic management changes 14 November 2011
Adobe PDF
573 KB
07 Nov 2011
Darling Mills Creek bridge beam installation night work
Adobe PDF
283 KB
31 Oct 2011
Windsor Road Bridge concrete pour night work
Adobe PDF
602 KB
28 Oct 2011
Windsor Road concrete barrier installation night work October 2011
Adobe PDF
332 KB
24 Oct 2011
Traffic management night work on the M2 near Barclay Road
Adobe PDF
328 KB
20 Oct 2011
Joint repair night work near Oakes Road October 2011
Adobe PDF
737 KB
20 Oct 2011
Concrete barrier installation on the M2 west of Windsor Road Oct 2011
Adobe PDF
332 KB
20 Oct 2011
Saw cutting night work between Hepburn Road and Yale Close
Adobe PDF
754 MB
20 Oct 2011
Concrete barrier installation on the M2 west of Windsor Road Oct 2011
Adobe PDF
1.1 MB
17 Oct 2011
Windsor Road Bridge concrete pour night work Oct 2011
Adobe PDF
598 KB
14 Oct 2011
Pavement repair night work between Oaks Rd & Yale Close Oct 2011
Adobe PDF
750 KB
10 Oct 2011
Yale Close to Hepburn Road saw cutting night work Oct 2011
Adobe PDF
745 KB
06 Oct 2011
Windsor Road service relocation night work
Adobe PDF
369 KB
04 Oct 2011
Pavement repair night work between Oakes Road and Yale Close Oct 2011
Adobe PDF
750 KB
27 Sep 2011
Removal of temporary noise wall night work near Westmore Drive Sep 2011
Adobe PDF
659 KB
21 Sep 2011
Night work to strengthen pavement between Yale Close and Barclay Road Sep 2011
Adobe PDF
324 KB
21 Sep 2011
Asphalt milling night work near Oakes Road Sep 2011
Adobe PDF
770 KB
14 Sep 2011
Barclay Road deck stressing night work
Adobe PDF
287 KB
14 Sep 2011
Night work to strengthen pavement between Oakes Rd and Yale close sep 2011
Adobe PDF
348 KB
12 Sep 2011
Cross stitching Oakes Road to Yale Close
Adobe PDF
348 KB
12 Sep 2011
Barclay Road mainline traffic management night work
Adobe PDF
344 KB
05 Sep 2011
Cross stitching Vincent St to Goodin Road night work
Adobe PDF
1.1 MB
31 Aug 2011
Windsor Road night work eastbound on ramp merge
Adobe PDF
434 KB
29 Aug 2011
New noise wall west of Barclay Road Bridge
Adobe PDF
459 KB
25 Aug 2011
Night work near Barclay & Oakes Road reissue
Adobe PDF
770 KB
02 Aug 2011
Night work to remove rock material between Barclay Road and Oakes Road
Adobe PDF
770 KB
25 Jul 2011
Cross Stitching Barclay Road to Yale Close
Adobe PDF
307 KB
25 Jul 2011
Western Zone asphalt milling night work
Adobe PDF
572 KB
11 Jul 2011
Western Zone Asphalt Milling
Adobe PDF
590 KB
11 Jul 2011
Temporary noise wall near Hepburn Road
Adobe PDF
336 KB
06 Jul 2011
Barrier night work installation near Oakes Road
Adobe PDF
283 KB
04 Jul 2011
Night work to remove rock material between Barclay Road and Oakes Road
Adobe PDF
573 KB
04 Jul 2011
Night work to relocate barriers near Barclay Road
Adobe PDF
664 KB
01 Jul 2011
Windsor Road girder installation night work
Adobe PDF
680 KB
27 Jun 2011
Windsor Road traffic management night work reissue
Adobe PDF
664 KB
15 Jun 2011
New noise walls east of Barclay Road Bridge
Adobe PDF
188 KB
22 Jun 2011
Windsor Road eastbound on ramp night work
Adobe PDF
684 KB
22 Jun 2011
Ventura Road access track proposal
Adobe PDF
66 KB
06 Jun 2011
Windsor Road Bridge traffic management night work June 2011
Adobe PDF
692 KB
30 May 2011
Ventura Road access track response to community feedback
Adobe PDF
279 KB
01 May 2011
Alternative Cycle Route maintenance Windsor Road and James Ruse Bridge
Adobe PDF
205 KB
06 May 2011
Alternative Cycle Route maintenance New North Rocks Rd and North Rocks Rd
Adobe PDF
274 KB
06 May 2011
Darling Mills Creek Bridge crane operation night work
Adobe PDF
598 KB
21 Apr 2011
Barclay Road noise wall night work
Adobe PDF
578 KB
21 Apr 2011
Oakes Road traffic management night work
Adobe PDF
610 KB
21 Apr 2011
Barclay Road traffic barrier installation night work
Adobe PDF
668 KB
11 Apr 2011
Oakes road night work Rev 2
Adobe PDF
590 KB
12 Apr 2011
Darling Mills Creek Tower Crane Install night work
Adobe PDF
688 KB
05 Apr 2011
Oakes Road night work
Adobe PDF
696 KB
06 Apr 2011
Morton Ave noise wall
Adobe PDF
303 KB
21 Mar 2011
Gossell Grove noise wall
Adobe PDF
258 KB
31 Mar 2011
Noise wall west of Barclay Road Bridge
Adobe PDF
270 KB
31 Mar 2011
Yale Close noise wall
Adobe PDF
164 KB
30 Mar 2011
Darling Mills Creek tower crane
Adobe PDF
672 KB
21 Mar 2011
Windsor Road median night work
Adobe PDF
541 KB
24 Mar 2011
Morton Ave noise wall night work
Adobe PDF
532 KB
24 Mar 2011
Barclay Road compound
Adobe PDF
188 KB
23 Mar 2011
Barclay Road Bridge night work
Adobe PDF
635 KB
15 Mar 2011
Darling Mills Creek bridge start of construction
Adobe PDF
1.3 MB
08 Mar 2011
Windsor Road compound
Adobe PDF
348 KB
03 Mar 2011
Windsor Road noise wall notification
Adobe PDF
86 KB
01 Mar 2011
Windsor Road noise wall night work
Adobe PDF
692 KB
11 Mar 2011
Ventura Road access notification
Adobe PDF
352 KB
14 Mar 2011
Barclay Road Bridge start of construction
Adobe PDF
332 KB
16 Feb 2011
Junction Road Services Work
Adobe PDF
307 KB
07 Feb 2011
Start of Construction - Windsor Road Bridge - Ch: 3600_WRB
Adobe PDF
76 KB
10 Feb 2011
Clearing Notification - Western Zone
Adobe PDF
271 KB
04 Feb 2011
Notifications - Central Zone: Pennant Hills Road, Pennant Hills to Terrys Creek, Epping
Document Title
Type
Size
Date
Night work to undertake noise wall changes on the Beecroft Road Bridge citybound on ramp
Adobe PDF
568 KB
16 Feb 2012
Night work underneath Beecroft Road Bridge to install scaffold
Adobe PDF
477 KB
16 Feb 2012
Revised dates for night work on Devlins Creek Bridge to install concrete bridge beams
Adobe PDF
253 KB
16 Feb 2012
Revised dates for night work on Devlins Creek Bridge to remove bridge parapets
Adobe PDF
252 KB
16 Feb 2012
Revised dates for night work on Devlins Creek Bridge to undertake a concrete pour
Adobe PDF
243 KB
16 Feb 2012
Night work on Devlins Creek Bridge to remove bridge parapets starting 9 February 2012
Adobe PDF
314 KB
02 Feb 2012
Night work on Devlins Creek Bridge to undertake a concrete pour starting 11 February 2012
Adobe PDF
304 KB
02 Feb 2012
Night work on the Hills M2 underneath Beecroft Road Bridge starting 10 February 2012
Adobe PDF
477 KB
02 Feb 2012
Night work to lift steel reinforcement underneath Beecroft Road Bridge starting 6 February 2012
Adobe PDF
584 KB
31 Jan 2012
Night work to install steel reinforcement under Murray Farm Road Bridge starting 6 February 2012
Adobe PDF
492 KB
30 Jan 2012
Beecroft Road bus ramp demolition night work commencing 10 February 2012
Adobe PDF
602 KB
30 Jan 2012
Preparation work for Beecroft Road bus ramp demolition night work commencing 1 February 2012
Adobe PDF
594 KB
27 Jan 2012
Beecroft Road Bridge eastbound onramp realignement 30 January 2012
Adobe PDF
541 KB
25 Jan 2012
Pavement strengthening between Norfolk Tunnel and Terrys Creek Bridge starting 2 February 2012
Adobe PDF
410 KB
25 Jan 2012
Beecroft Road Bridge eastbound onramp realignement 30 January 2012
Adobe PDF
586 KB
23 Jan 2012
Temporary noise wall removal near Kent Street Footbridge 8 December 2011
Adobe PDF
332 KB
23 Jan 2012
Pavement strengthening night work between Pennant Hills Road and Devlins Creek Bridge starting 2 February
Adobe PDF
348 KB
23 Jan 2012
Pavement strengthening night work between Beecroft Road Bridge and Norfolk Tunnel starting 1 February 2012
Adobe PDF
352 KB
23 Jan 2012
Pavement strengthening night work between Allerton Road and Kent Street Footbridge starting 30 January 2012
Adobe PDF
315 KB
23 Jan 2012
Devlins Creek Bridge beam installation Jan 2012
Adobe PDF
324 KB
09 Jan 2012
Night work on Devlins Creek Bridge starting 12 January 2012
Adobe PDF
319 KB
06 Jan 2012
Noise wall changes east of Murray Farm Road Bridge
Adobe PDF
467 KB
05 Jan 2012
Night work on Hills M2 underneath Beecroft Road Bridge new dates December 2011
Adobe PDF
496 KB
30 Dec 2011
Night work on Hills M2 underneath Murray Farm Road Bridge new dates December 2011
Adobe PDF
492 KB
27 Dec 2011
Devlins Creek Bridge beam installation westbound December 2011
Adobe PDF
319 KB
08 Dec 2011
Beecroft Road Bridge night work December 2011
Adobe PDF
598 KB
05 Dec 2011
Beecroft Road Bridge scaffolding night work December 2011
Adobe PDF
496 KB
05 Dec 2011
Traffic management night work on the motorway near Beecroft Road Bridge December 2011
Adobe PDF
594 KB
05 Dec 2011
Scaffolding night work on the motorway under Murray Farm Road Bridge December 2011
Adobe PDF
496 KB
05 Dec 2011
Relocation of noise wall eastbound between Kent Street and Beecroft Road
Adobe PDF
397 KB
01 Dec 2011
Show archived documents
Murray Farm Road Bridge scaffolding night work December 2011
Adobe PDF
496 KB
30 Nov 2011
Traffic management night work on the motorway near Murray farm Road Bridge November 2011
Adobe PDF
586 KB
29 Nov 2011
Kent Street footbridge eastbound noise wall night work December 2011
Adobe PDF
602 KB
24 Nov 2011
Kent Street footbridge eastbound noise wall night work
Adobe PDF
733 KB
21 Nov 2011
Beecroft Road Bridge night work and lane closures 25 November 2011
Adobe PDF
1.3 MB
18 Nov 2011
Traffic switch on the motorway near Murray Farm Road Bridge 25 November 2011
Adobe PDF
590 KB
18 Nov 2011
Cross stitching between Norfolk Tunnel and Terrys Creek Bridge November 2011
Adobe PDF
406 KB
15 Nov 2011
Night work to install scaffold on the central median under Murray Farm Road bridge November2011
Adobe PDF
487 KB
14 Nov 2011
New noise wall west of Murray Farm Road Bridge November 2011
Adobe PDF
446 KB
11 Nov 2011
Beecroft Road Bridge westbound abutment formwork removal November 2011
Adobe PDF
598 KB
07 Nov 2011
Saw cutting night work between Murray Farm Road Bridge and Kent Street
Adobe PDF
319 KB
01 Nov 2011
Scaffolding and traffic management night work eastbound under Murray Farm Road Bridge
Adobe PDF
594 KB
25 Oct 2011
Saw cutting night work between Devlins Creek Bridge and Murray Farm Road Bridge Oct 2011
Adobe PDF
336 KB
20 Oct 2011
Beecroft Road Bridge and Norfolk Tunnel cross stitching night work October 2011
Adobe PDF
336 KB
19 Oct 2011
Murray Farm Road Bridge scaffolding night work Oct 2011
Adobe PDF
594 KB
17 Oct 2011
Pavement repair night work between Murray Farm Road and the Norfolk Tunnel 2425 Oct 2011
Adobe PDF
811 KB
14 Oct 2011
Pavement repairs night work between Murray Farm Rd & Norfolk Tunnel 11 Oct 2011
Adobe PDF
483 KB
11 Oct 2011
Pavement repair night work between Murray Farm Road and the Norfolk Tunnel 7,1012 Oct 2011
Adobe PDF
483 KB
05 Oct 2011
Pavement repairs night work between Murray Farm Rd & Norfolk Tunnel 5 Oct 2011
Adobe PDF
483 KB
05 Oct 2011
Devlins Creek Bridge beam installation night work westbound
Adobe PDF
315 KB
04 Oct 2011
Night work on M2 under Beecroft Road Bridge reissue October 2011
Adobe PDF
492 KB
04 Oct 2011
Devlins Creek piling night work reissue October 2011
Adobe PDF
307 KB
30 Sep 2011
Devlins Creek piling night work reissue September 2011
Adobe PDF
311 KB
01 Sep 2011
Saw cutting night work between Devlins Creek Bridge and Murray Farm Road Oct 2011
Adobe PDF
348 KB
29 Sep 2011
Pavement repair night work between Murray farm Road and the Norfolk Tunnel Oct 2011
Adobe PDF
483 KB
29 Sep 2011
Barclay Road Bridge deck stressing night work Sep 2011
Adobe PDF
287 KB
29 Sep 2011
Devlins Creek westbound bridge beam installation
Adobe PDF
311 KB
15 Sep 2011
Beecroft Road Bridge night work and lane closures
Adobe PDF
1.6 MB
09 Sep 2011
Traffic switch under Beecroft Road Bridge night work
Adobe PDF
418 KB
06 Sep 2011
Kent Street to Allerton Road night work
Adobe PDF
315 KB
29 Aug 2011
Devlins Creek Piling night work
Adobe PDF
311 KB
19 Aug 2011
Murray Farm Road Bridge traffic switch night work round 2
Adobe PDF
152 KB
19 Aug 2011
Somerset Street increased vehicle movements
Adobe PDF
471 KB
05 Aug 2011
Night work Kent Street to Allerton Road
Adobe PDF
315 KB
08 Aug 2011
Kent street footbridge noise wall westbound night work
Adobe PDF
598 KB
27 Jul 2011
Beecroft Road Bridge night work reissue
Adobe PDF
504 KB
22 Jul 2011
Central Zone asphalt milling night work
Adobe PDF
360 KB
13 Jul 2011
Beecroft Road scaffolding night work
Adobe PDF
262 KB
04 Jul 2011
Beecroft Road weekend lane closure
Adobe PDF
696 KB
01 Jul 2011
Kent Street to Allerton Road WB cross stitching night work
Adobe PDF
573 KB
29 Jun 2011
Kerry Avenue noise wall night work reissue
Adobe PDF
680 KB
22 Jun 2011
Somerset Street noise wall relocation
Adobe PDF
520 KB
16 Jun 2011
Beecroft Road Bridge traffic barrier installation
Adobe PDF
520 KB
13 Jun 2011
West of Beecroft Road Bridge traffic management night work
Adobe PDF
332 KB
30 May 2011
Murray Farm Road Bridge traffic management stage 1
Adobe PDF
115 KB
13 Apr 2011
Devlins Creek Bridge noise wall night work
Adobe PDF
1.3 MB
30 Mar 2011
Kerry Ave noise wall night work
Adobe PDF
516 KB
30 Mar 2011
Devlins Creek compound/bridgework start of construction
Adobe PDF
258 KB
07 Mar 2011
Beecroft Road bridge night work
Adobe PDF
471 KB
07 Mar 2011
Somerset Street construction site
Adobe PDF
389 KB
01 Mar 2011
Devlins Creek noise wall
Adobe PDF
348 KB
15 Mar 2011
Kerry Avenue noise wall
Adobe PDF
188 KB
15 Mar 2011
Murray Farm Road start of construction
Adobe PDF
53 KB
14 Feb 2011
Beecroft Road bridge start of construction and bus ramp
Adobe PDF
344 KB
17 Feb 2011
Devlins Creek Bridge - Noise Wall Movement
Adobe PDF
131 KB
11 Feb 2011
Clearing Notification - Central Zone
Adobe PDF
271 KB
04 Feb 2011
Notifications - Eastern Zone: Terry Creek, Epping to Lane Cove Road, North Ryde
Document Title
Type
Size
Date
Terrys Creek Bridge tilt up wall concrete pour Feb 10 2012 additional dates
Adobe PDF
551 KB
20 Feb 2012
Night work for saw cutting near Terrys Creek Bridge Feb 2012
Adobe PDF
590 KB
20 Feb 2012
Terrys Creek Bridge stitch pour night work 24 Feb 2012
Adobe PDF
318 KB
17 Feb 2012
Gate movement night work on the Hills M2 near Waterloo Road Feb 2012
Adobe PDF
545 KB
15 Feb 2012
Traffic switch night work near Culloden Road Feb 2012 additional dates
Adobe PDF
233 KB
09 Feb 2012
Night work for saw cutting between Terrys Creek Bridge and Busaco Road
Adobe PDF
523 KB
08 Feb 2012
Night work for saw cutting near Khartoum Road Feb 2012
Adobe PDF
313 KB
06 Feb 2012
Terrys Creek Bridge tilt up wall concrete pour Feb 2012 additional dates
Adobe PDF
310 KB
06 Feb 2012
Crossover night work on the Hills M2 near Khartoum Road
Adobe PDF
600 KB
02 Feb 2012
Critical night work near Culloden Road
Adobe PDF
519 KB
31 Jan 2012
Cross stitching night work Terrys Creek Bridge to Vimiera Jan to Mar 2012
Adobe PDF
332 KB
23 Jan 2012
Traffic switch night work near Culloden Road
Adobe PDF
537 KB
18 Jan 2012
Terrys Creek Bridge tilt up wall concrete pour
Adobe PDF
598 KB
17 Jan 2012
Culloden Road sign removal night work
Adobe PDF
598 KB
17 Jan 2012
Khartoum Road sign relocation night work
Adobe PDF
598 KB
16 Jan 2012
Temporary noise wall removal night work near Busaco Road
Adobe PDF
569 KB
16 Jan 2012
Saw cutting night work near Busaco Road, Marsfield Jan 2012
Adobe PDF
291 KB
10 Jan 2012
Terrys Creek Bridge noise wall night work Jan 2012
Adobe PDF
233 KB
10 Jan 2012
Night work to modify temporary noise wall west of Terrys Creek Bridge
Adobe PDF
545 KB
05 Jan 2012
Night work to pour the Terrys Creek Bridge deck new date January 2012
Adobe PDF
266 KB
04 Jan 2012
Show archived documents
Night work on Hills M2 between Busaco Road and the toll plaza new January dates December 2011
Adobe PDF
225 KB
30 Dec 2011
Night work to saw cut new pavement between Vimiera Road and the toll plaza new dates December 2011
Adobe PDF
414 KB
28 Dec 2011
Night work to pour concrete at Terrys Creek Bridge
Adobe PDF
618 KB
14 Dec 2011
Night work on Hills M2 between Busaco Road and the toll plaza new dates December 2011
Adobe PDF
512 KB
09 Dec 2011
Terrys Creek Bridge to Vimiera Road cross stitching night work December 2011
Adobe PDF
639 KB
05 Dec 2011
Terrys Creek Bridge beam installation night work December 2011
Adobe PDF
647 KB
02 Dec 2011
Night work between Busaco Road and the toll plaza December 2011
Adobe PDF
565 KB
02 Dec 2011
Alma Road to Khartoum Road cross stitching night work December 2011
Adobe PDF
684 KB
01 Dec 2011
Vimiera Road to Culloden Road cross stitching night work December 2011
Adobe PDF
643 KB
30 Nov 2011
Lane Cove off ramp traffic management night work
Adobe PDF
492 KB
09 Nov 2011
Night work for saw cutting between Vimiera Road and the toll plaza November 2011
Adobe PDF
311 KB
11 Nov 2011
Christie Road Bridge beam installation November 2011
Adobe PDF
180 KB
10 Nov 2011
Vimiera Road to Culloden Road eastbound cross stitching night work October 2011
Adobe PDF
647 KB
26 Oct 2011
Terrys Creek Bridge girder installation night work October 2011
Adobe PDF
344 KB
07 Oct 2011
Christie Road Bridge closure for deck stressing 15 October 2011
Adobe PDF
188 KB
07 Oct 2011
Night work to strengthen pavement between Terrys Creek Bridge and Vimiera Road Oct 2011
Adobe PDF
643 KB
29 Sep 2011
Terrys Creek Bridge night work to build a temporary noise wall
Adobe PDF
586 KB
19 Sep 2011
Night work to strengthen pavement between Alma and Khartoum Road Sep 2011
Adobe PDF
655 KB
16 Sep 2011
Temporary noise wall across Devlins Creek Bridge
Adobe PDF
561 KB
13 Sep 2011
Talavera Road service relocation night work 1A
Adobe PDF
606 KB
12 Sep 2011
Terrys Creek Bridge tilt panel delivery night work
Adobe PDF
307 KB
08 Sep 2011
Road sweeping near Busaco Road night work
Adobe PDF
627 KB
09 Aug 2011
Khartoum Road Bridge noise wall night work
Adobe PDF
553 KB
08 Aug 2011
Cross stitching night work Busaco Road to Culloden Road EB reissue
Adobe PDF
274 KB
01 Aug 2011
Alma Road to Khartoum Road cross stitching night work
Adobe PDF
655 KB
27 Jul 2011
Night work to install traffic barriers near Khartoum Road Bridge
Adobe PDF
299 KB
26 Jul 2011
Christie traffic switch reissue
Adobe PDF
565 KB
25 Jul 2011
Traffic switch under Christie Road
Adobe PDF
565 KB
11 Jul 2011
Christie Road Bridge traffic management stage 3
Adobe PDF
111 KB
08 Jul 2011
Vimiera Road to Culloden Road EB cross stitching night work
Adobe PDF
295 KB
29 Jun 2011
Khartoum Road Bridge additional noise wall movement
Adobe PDF
168 KB
16 Jun 2011
Christie Road Bridge traffic management stage 2
Adobe PDF
66 KB
08 Jun 2011
New noise wall on the M2 west of Christie Road, Macquarie Park
Adobe PDF
168 KB
08 Jun 2011
Talavera Road start of construction
Adobe PDF
233 KB
08 Jun 2011
Khartoum Road Bridge start of construction
Adobe PDF
180 KB
17 May 2011
Alternative Cycle Route maintenance Cox's Rd and Kent Rd
Adobe PDF
217 KB
06 May 2011
Terrys Creek tower crane night work reissue 3
Adobe PDF
627 KB
21 Apr 2011
Terrys Creek Tower Crane Install-rev2
Adobe PDF
696 KB
11 Apr 2011
Busaco Road noise wall night work
Adobe PDF
549 KB
24 Mar 2011
Khartoum Road Bridge noise wall
Adobe PDF
311 KB
21 Mar 2011
Terrys Creek compound
Adobe PDF
254 KB
23 Mar 2011
Christie Road compound
Adobe PDF
205 KB
14 Mar 2011
Terrys Creek night work tower crane
Adobe PDF
549 KB
07 Mar 2011
Busaco Road noise wall
Adobe PDF
229 KB
15 Mar 2011
Terrys Creek Viaduct start of construction
Adobe PDF
315 KB
14 Mar 2011
Terrys Creek Bridge - Noise Wall Movement - Ch: 13760_TCB_1
Adobe PDF
78 KB
07 Feb 2011
Start of Construction - Christie Road Bridge - Ch: 16100_CRB1
Adobe PDF
82 KB
07 Feb 2011
Main construction compound notification
Adobe PDF
128 KB
07 Dec 2010
North Ryde train station compound notification
Adobe PDF
236 KB
08 Dec 2010
Clearing Notification - Eastern Zone
Adobe PDF
271 KB
04 Feb 2011
Notifications - Norfolk Tunnel, Epping
Document Title
Type
Size
Date
Norfolk Tunnel general works notification Jan 2012
Adobe PDF
504 KB
23 Jan 2012
Norfolk Tunnel emergency work Jan 2012
Adobe PDF
741 KB
10 Jan 2012
Tunnel work over the Christmas and New Year period
Adobe PDF
442 KB
19 Dec 2011
Norfolk Tunnel portal archway widening night work December 2011 - January 2012
Adobe PDF
750 KB
02 Dec 2011
Batter excavation and rock bolting near the Norfolk Tunnel November 2011 to January 2012
Adobe PDF
729 KB
18 Nov 2011
Norfolk Tunnel batter excavation night work Nov-Dec 2011
Adobe PDF
651 KB
07 Nov 2011
Norfolk Tunnel batter excavation night work east and west portal Oct-Dec 2011
Adobe PDF
664 KB
22 Sep 2011
Norfolk Tunnel service trench night work western end Oct 2011
Adobe PDF
459 KB
22 Sep 2011
Norfolk Tunnel work update September 2011
Adobe PDF
459 KB
16 Sep 2011
Norfolk Tunnel service trench night work eastern end - Sept-Oct 2011
Adobe PDF
848 KB
05 Sep 2011
Show archived documents
Norfolk Tunnel service trench night work western end - Aug-Sept 2011
Adobe PDF
705 KB
27 Jul 2011
Norfolk Tunnel service trench and safety screen night work eastern and western end - July 2011
Adobe PDF
692 KB
07 Jul 2011
Norfolk Tunnel night work eastern and western end - June 2011
Adobe PDF
840 KB
30 May 2011
Norfolk Tunnel service investigation night work eastern end - 11-12 May 2011
Adobe PDF
635 KB
17 May 2011
Norfolk Tunnel service investigation night work eastern end - 24 May 2011
Adobe PDF
840 KB
04 May 2011
Norfolk Tunnel rock bolt trail night work - April - May 2011
Adobe PDF
545 KB
20 Apr 2011
Norfolk Tunnel compound establishment work - April 2011
Adobe PDF
795 KB
13 Apr 2011
Norfolk Tunnel noise curtain installation night work eastern and western end - April 2011
Adobe PDF
565 KB
29 Mar 2011
Norfolk Tunnel night work eastern and western end - March 2011
Adobe PDF
500 KB
04 Mar 2011
Norfolk Tunnel noise curtain installation night work eastern and western end - Feb-March 2011
Adobe PDF
450 KB
11 Feb 2011
Notifications - Early Works
Document Title
Type
Size
Date
Traffic management night work Ch 11600-12650_Rev2
Adobe PDF
295 KB
14 Mar 2011
Traffic barrier installation night work_Ch 3200-4200_Rev2
Adobe PDF
545 KB
01 Mar 2011
Show archived documents
Traffic management night work - Ch 5500-7900_Rev1
Adobe PDF
532 KB
17 Feb 2011
Traffic management night work Ch 4200-7900-Rev1
Adobe PDF
582 KB
17 Feb 2011
Traffic management night work Ch.11600-12650_Rev1
Adobe PDF
365 KB
17 Feb 2011
Traffic Barrier Installation - Night - Ch: 9300-10000 Rev 1
Adobe PDF
467 KB
11 Feb 2011
Traffic Barrier Installation - Night - Ch: 9350-11550 Rev 2
Adobe PDF
614 KB
11 Feb 2011
Traffic Barrier Installation - Night - Ch: 3200-4200
Adobe PDF
518 KB
10 Feb 2011
Traffic Management Night Work - Bus Stop - Ch: 5250-5350 Rev 4
Adobe PDF
450 KB
10 Feb 2011
Junction Rd Set Up Work Area & Services Work
Adobe PDF
297 KB
07 Feb 2011
Traffic Barrier Installation - Christie Road pier - Ch: 16350-17200
Adobe PDF
236 KB
07 Feb 2011
Traffic Management Night Work - Bus Stop - Ch: 7850-7950 Rev 4
Adobe PDF
426 KB
04 Feb 2011
Traffic Management Night Work - Bus Stop - Ch: 5250 - 5350 Rev 3
Adobe PDF
439 KB
01 Feb 2011
Traffic Management Night Work - Ch: 3500 - 4000
Adobe PDF
526 KB
01 Feb 2011
Traffic Barrier Installation - Night - Ch: 12000-15400 Rev 3
Adobe PDF
744 KB
31 Jan 2011
Traffic Management Night Work - Crossover. Ch: 4560-5200
Adobe PDF
386 KB
28 Jan 2011
Traffic Management Night Work - Bus Stop - Ch: 7850-7950 Rev 3
Adobe PDF
508 KB
25 Jan 2011
Traffic Barrier Installation - Night - Ch: 15950 - 16200
Adobe PDF
480 KB
25 Jan 2011
Traffic Management Night Work - Crossover. Ch: 4500 Rev 3
Adobe PDF
398 KB
25 Jan 2011
Traffic Barrier Installation - Night - Ch: 9350-11550 Rev 1
Adobe PDF
484 KB
21 Jan 2011
Traffic Management Night Work - Crossover - Ch: 11600 Rev 4
Adobe PDF
639 KB
21 Jan 2011
Traffic Barrier Installation - Night - Ch: 12000-15400 Rev 2
Adobe PDF
574 KB
20 Jan 2011
Traffic Management Night Work - Crossover - Ch: 15700
Adobe PDF
488 KB
17 Jan 2011
Traffic Management Night Work - Crossover. Ch: 3250
Adobe PDF
483 KB
17 Jan 2011
Traffic Barrier Installation - Night - Ch. 5800-7675
Adobe PDF
508 KB
17 Jan 2011
Traffic Management Night Work - Crossover. Ch: 4500 Rev 2
Adobe PDF
528 KB
14 Jan 2011
Median widening under Windsor Rd - Updated Ch: 3600-4000
Adobe PDF
532 KB
14 Jan 2011
Traffic Management Night Work - Bus Stop - Ch: 5250 - 5350 Rev 2
Adobe PDF
514 KB
14 Jan 2011
Traffic Management Night Work - Bus Stop - Ch: 7850-7950 Rev 2
Adobe PDF
507 KB
14 Jan 2011
Traffic Management Night Work - Crossover - Ch: 11600 Rev 3
Adobe PDF
642 KB
14 Jan 2011
Traffic Barrier Installation - Night - Ch: 13060-15400 Rev 1
Adobe PDF
593 KB
12 Jan 2011
Traffic Management Night Work- Crossover. Ch: 4500 Rev 1
Adobe PDF
487 KB
10 Jan 2011
Traffic Management Night Work - Bus Stop - Ch: 7850-7950 Rev 1
Adobe PDF
442 KB
10 Jan 2011
Traffic Management Night Work - Ch: 3600-4000
Adobe PDF
499 KB
10 Jan 2011
Traffic Management Night Work - Crossover - Ch: 11600 Rev 2
Adobe PDF
664 KB
04 Jan 2011
Traffic Management Night Work - Crossover - Ch: 15300
Adobe PDF
587 KB
29 Dec 2010
Traffic Management Night Work - Crossover - Ch: 9500
Adobe PDF
705 KB
28 Dec 2010
Traffic Management Night Work - Bus Stop - Ch: 5250 & 5750
Adobe PDF
538 KB
28 Dec 2010
Traffic Management Night Work - All zones
Adobe PDF
329 KB
21 Dec 2010
January 2011 night work early notification
Adobe PDF
329 KB
20 Dec 2010
Factsheets, Flyers and Q&As - Construction
Document Title
Type
Size
Date
Hills M2 Eastbound Bus Lane Changes March 2012
Adobe PDF
106 KB
22 Feb 2012
Beecroft Bus Ramp Demolition QA
Adobe PDF
99 KB
13 Feb 2012
Beecroft Road bus ramp demolition flyer
Adobe PDF
416 KB
30 Jan 2012
RMS Noise fact sheet - December 2011
Adobe PDF
1.8 MB
22 Dec 2011
Eastbound bus lane changes flyer
Adobe PDF
262 KB
25 Oct 2011
Architectural treatment fact sheet
Adobe PDF
287 KB
26 Sep 2011
Combined Central Zone compounds fact sheet
Adobe PDF
725 KB
01 Aug 2011
Vibration management fact sheet July 2011
Adobe PDF
348 KB
01 Jul 2011
RTA vibration guide
Adobe PDF
848 KB
01 Jul 2011
Public Transport fact sheet July 2011
Adobe PDF
184 KB
01 Jul 2011
Terrys Creek Bridge Q&A
Adobe PDF
205 KB
14 Jun 2011
Windsor Road bus stop closure flyer
Adobe PDF
205 KB
01 Jun 2011
Talavera Road bus stop movement flyer
Adobe PDF
229 KB
01 Jun 2011
Beecroft Road Bridge Q&A
Adobe PDF
147 KB
01 May 2011
Murray Farm Road Bridge Q&As
Adobe PDF
205 KB
01 May 2011
Barclay Road Bridge Q&A
Adobe PDF
393 KB
01 May 2011
Christie Road Bridge Q&A's
Adobe PDF
106 KB
01 May 2011
Windsor Road Bridge Q&A's
Adobe PDF
123 KB
01 May 2011
Clearing Q&A's
Adobe PDF
172 KB
01 May 2011
Norfolk Tunnel Q&A
Adobe PDF
229 KB
01 Apr 2011
Devlins Creek compound/bridge fact sheet
Adobe PDF
307 KB
18 Mar 2011
Noise management fact sheet
Adobe PDF
82 KB
01 Mar 2011
Norfolk Tunnel Australia Day work
Document Title
Type
Size
Date
Norfolk Tunnel Australia Day work notification Jan 2012
Adobe PDF
516 KB
18 Jan 2012
Norfolk Tunnel Australia Day work advertising Jan 2012
Adobe PDF
172 KB
16 Jan 2012
Norfolk Tunnel weekend widening work 2011
Document Title
Type
Size
Date
Tunnel weekend work Q&A
Adobe PDF
135 KB
27 Oct 2011
Tunnel weekend work notification
Adobe PDF
598 KB
27 Oct 2011
Norfolk Tunnel weekend work 2011 advertising
Adobe PDF
193 KB
24 Oct 2011
Norfolk Tunnel weekend work 2011 postcard
Adobe PDF
340 KB
24 Oct 2011
October long weekend closures 2011
Document Title
Type
Size
Date
Hills M2 Upgrade October long weekend night work near Yale Close
Adobe PDF
258 KB
23 Sep 2011
Hills M2 Upgrade October long weekend night work Beecroft Road to Culloden Road
Adobe PDF
258 KB
23 Sep 2011
Hills M2 Upgrade October long weekend closure advertisement
Adobe PDF
188 KB
19 Sep 2011
Hills M2 Upgrade October long weekend closure postcard
Adobe PDF
344 KB
19 Sep 2011
Hills M2 Upgrade October long weekend closure bus stop flyer
Adobe PDF
233 KB
19 Sep 2011
Advertising
Document Title
Type
Size
Date
Beecroft bus ramp demolition advertisement
PDF
205 KB
22 Feb 2012
Beecroft Road Bridge lane closures advertisement November 2011
PDF
41 KB
14 Nov 2011
Herring Road onramp closure ad November 2011
PDF
98 KB
10 Nov 2011
Christie Road Bridge changed traffic conditions advertising October 2011
PDF
164 KB
07 Oct 2011
Hills M2 Upgrade quarterly update advertisement Oct to Dec 2011
PDF
115 KB
05 Oct 2011
Hills M2 Upgrade October to December 2011 Construction look ahead ad
PDF
115 KB
01 Oct 2011
Murray Farm Road Bridge traffic switch August 2011 Ad
PNG
45 KB
19 Aug 2011
Community information sessions August 2011
Adobe PDF
61 KB
22 Jul 2011
Murray Farm Road Bridge traffic changes July 2011
Adobe PDF
53 KB
20 Jul 2011
Hills M2 Upgrade work update July - September 2011
Adobe PDF
41 KB
11 Jul 2011
Beecroft Road Bridge lane closures advertisement
Adobe PDF
37 KB
20 Jun 2011
M2 Upgrade work update April - June 2011 Ad
Adobe PDF
90 KB
18 Apr 2011
M2 Upgrade community information session Ad May 2011
Adobe PDF
119 KB
25 Apr 2011
Barclay Road Bridge traffic management stage 1
Adobe PDF
66 KB
28 Mar 2011
Christie Road Bridge traffic management stage1
Adobe PDF
66 KB
04 Apr 2011
Murray Farm Road Bridge traffic management stage 1
Adobe PDF
111 KB
14 Mar 2011
Windsor Road Brige traffic management stage 1
Adobe PDF
77 KB
11 Apr 2011
Media Releases
Document Title
Type
Size
Date
Price of progress November 2011
Adobe PDF
365 KB
11 Nov 2011
Cashless tolling to be introduced on Hills M2
Adobe PDF
61 KB
20 Jul 2011
Plans, protocols, approvals & licenses
Document Title
Type
Size
Date
Construction Environmental Management Plan Document List
Adobe PDF
-
23 Dec 2010
Hills M2 Upgrade Compliance Tracking Table - 6 Month Audit 22 February 2012
Adobe PDF
926 KB
22 Feb 2012
Hills M2 Upgrade Environmental Protection License No 13350
Adobe PDF
745 KB
03 Jan 2012
Hills M2 Upgrade Urban Design and Landscape Management Plan
Adobe PDF
46 MB
15 Nov 2011
Hills M2 Upgrade Complaints Management Protocol - Appendix A to CIP
Adobe PDF
500 KB
28 Jun 2011
Ancillary Facility - Main Construction Compound Approval
Adobe PDF
168 KB
24 Dec 2010
Hills M2 Upgrade Compliance Tracking Program and Construction Environmental Management Plan & Sub Plans Approval
Adobe PDF
200 KB
24 Dec 2010
Hills M2 Upgrade Community Involvement Plan
Adobe PDF
1.2 MB
28 Jun 2011
Presentations - Construction
Document Title
Type
Size
Date
M2 Upgrade Beecroft Cheltenham Civic Trust update presentation Mar 2011
Adobe PDF
1.7 MB
09 Mar 2010
M2 Upgrade Clearing and Mulching Key Stakeholder presentation Feb 2011
Adobe PDF
2.4 MB
09 Mar 2010
Alternative cycle route - Construction
Document Title
Type
Size
Date
Alternative cycle route map - four sections
Adobe PDF
1.7 MB
20 Dec 2010
Websites - Construction
Hills M2 -
http://www.hillsm2.com.au
Transurban -
http://www.transurban.com.au
RTA Live Traffic Updates -
http://www.livetrafficnsw.com.au
HillsBus -
http://www.hillsbus.com.au
Busways -
http://www.busways.com.au
Building Sydney Motorways -
http://www.buildingsydneymotorways.com.au
© Copyright
2011
Hills M2 Upgrade